HERE ARE SOME OF THE CURRENT & RECENTLY COMPLETED BLUEWATER PROJECTS…

Downtown Palm Beach Gardens Mall (2024)

Publix Coral Springs (2023)

1625 Ocean (2022)

Artistry, inspiration, style, and elegance exude from each residence, designed by famed South Florida architect Randall Stofft. A transformative living experience on the exquisite shores of Delray Beach, this Moss project consisted of more than 120 feet of prime oceanfront, 10 residences and 4 penthouses, all relying on Bluewater’s expertise in excavation, base, subgrades, and utility work. Visit https://www.1625ocean.com/ for more…

1500 Centrepark (2021)

Completion of the baserock for brick paver installation at a beautiful luxury condo complex in West Palm Beach.

 
 
 

Bay Harbor Repairs (2021)

Emergency response you can count on! These repairs for water system leaks at Bay Harbor. We mobilized to the site within 48 hours and completed 3 pipe repairs in 2 days. Then followed with careful backfilling with flowable fill and finally, asphalt patching the following day to get the road back open to traffic.

Ferncrest Utilities (2021)

Water valve replacements for Ferncrest Utilities’ Water Treatment Plant in Davie. This job involved working around existing utilities and some tough underground conditions. We replaced the existing valves and improved the isolation capabilities as well.

BurgerFi,Logo,240_240.jpeg

Burger Fi PBG Sewer (2020)

Tie-in to a 13’ deep sewer main with a new sanitary service for the latest Burger-Fi location in Palm Beach Gardens. Using well-point dewatering and trench shoring enabled this service to be installed quickly, safely, and clean.

Southeastern Freight Lines

Finishing approximately 12,000 sq-yds of rock at the Miami location. Proper grading is an art that is mastered by few, though many try. Our skilled operators are touted as some of the best in the business!